Re: Lahore Airport Expansion Project

Post by Pakistan-1 »

To be honest the proposal in the video looks a lot better than that jasmine design
Image
Special Concept Livery to celebrate Pakistan's 70th year of Independence
PKPANL
Registered Member
Posts: 39
Joined: Tue Nov 18, 2014 1:26 pm

Re: Lahore Airport Expansion Project

Post by PKPANL »

uzkt01 wrote: Thu Feb 16, 2017 7:41 pm Karachi Airport needs modernization as well. It hasnt been touched since 90s. They should have started work in KHI first. Lahore airport did get a expansion in 2000s.
Karachi airport is still best airport and better than Lahore. The area need to be expend is waiting lounges only. Boarding hall have enough counters to facilitate all pax. It was well planned airport and still doing well without any expansion. All Pakistani airports need same planning from beginning.
pk363
Registered Member
Posts: 777
Joined: Mon Dec 31, 2007 8:07 am
Location: Dubai, UAE

Re: Lahore Airport Expansion Project

Post by pk363 »

PKPANL wrote: Sat Feb 18, 2017 9:58 am
uzkt01 wrote: Thu Feb 16, 2017 7:41 pm Karachi Airport needs modernization as well. It hasnt been touched since 90s. They should have started work in KHI first. Lahore airport did get a expansion in 2000s.
Karachi airport is still best airport and better than Lahore. The area need to be expend is waiting lounges only. Boarding hall have enough counters to facilitate all pax. It was well planned airport and still doing well without any expansion. All Pakistani airports need same planning from beginning.
No doubt Karachi airport despite being more than a decade old than Lahore is still far better, spacious and facilitated. In addition not only the CAA, FIA and customs staff posted is better trained and bit more professional than other airports but also the airlines/agents staff are also more efficient. Whilst there is no current capacity issue according to the traffic it handles some areas need improvement:
1. Replacement of boarding bridges was long overdue but that is now in progress, there was provision of 2 additional gates each at both the satellites which can increase the number from 12 to 14.
2. Repairs and maintenance is due for the domestic side CAA should bring this at par at least with the international side.
3. All the elevators need immediate replacement, inside the terminal as well as in the concourse area.
4. Baggage reclaim belts too are now worn out so be replaced with new inclines ones (similar to those at Dubai).
5. New baggage identification system at par with the international standards both at departures and arrivals be installed
6. A food court in the connecting corridor or transit area on the international side
7. Airside presents a very barren and brown look, this needs to be properly landscaped with technical assistance from an internationally reputed landscape designer like Cracknell or Parsons
User avatar
Abbas Ali
Site Admin
Posts: 52157
Joined: Thu Aug 05, 2004 6:52 pm
Location: Pakistan

Re: Lahore Airport Expansion Project

Post by Abbas Ali »

Today Prime Minister Nawaz Sharif informed Pakistani community in Kuwait that originally planned new terminal building of Lahore Airport was reduced in size after the overthrow of his government in 1999. The terminal building (inaugurated in 2003) faces problems in handling more than two international flights at a time, he said.

Now the project to expand airport's terminal building will be launched, he informed the audience.

Abbas
Dil Dil Pakistan... Jaan Jaan Pakistan

See you at:
Image
User avatar
Abbas Ali
Site Admin
Posts: 52157
Joined: Thu Aug 05, 2004 6:52 pm
Location: Pakistan

Re: Lahore Airport Expansion Project

Post by Abbas Ali »

* Thirteen boarding bridges will be added to increase the total number of boarding bridges to twenty by the end of year 2018. Currently airport's terminal building has seven boarding bridges.

* Future plan sees total number of boarding bridges increased to thirty.

* Expanded car park will also have two underground levels.

* New approach roads will be constructed for the airport.

* Construction work expected to begin by the end of March 2017.

* The airport will become capable of handling fifteen million passengers annually after completion of expansion work.

https://jang.com.pk/print/283354-todays-print

Abbas
Dil Dil Pakistan... Jaan Jaan Pakistan

See you at:
Image
User avatar
Abbas Ali
Site Admin
Posts: 52157
Joined: Thu Aug 05, 2004 6:52 pm
Location: Pakistan

Re: Lahore Airport Expansion Project

Post by Abbas Ali »

According to Dunya News channel:

Image
Decision made to expand Lahore Airport.

Image
45 billion rupees will be spent on Lahore Airport expansion project.

Image
The airport will be able to handle 20 million passengers annually after completion of expansion work. Currently the airport is capable of handling 6.2 million passengers annually.

Image
Three level car park will be constructed at a cost of 4.9 billion rupees. Apparently this image shows ground level of the car park

The new car park will have capacity for 4500 vehicles. Currently 1200 vehicles can be parked at the airport.

Image
2.2 billion rupees will be spent on airport's new & expanded roads network.

Image
35 billion rupees will be spent on airport's terminal building expansion work. The new expanded terminal building will resemble the shape of Pakistan's national flower i.e. jasmine flower.

Abbas
Dil Dil Pakistan... Jaan Jaan Pakistan

See you at:
Image
ammad
Registered Member
Posts: 1710
Joined: Sat Dec 17, 2005 10:52 am
Location: San Francisco. C.A.

Re: Lahore Airport Expansion Project

Post by ammad »

Good for Lahore, but Govt should also think to work on Up gradation and renovation of KHI Airport too. Providing boarding bridges is good step but some good amount of money should also be spent on KHI Airport too.
Fortune favours brave.
User avatar
Abbas Ali
Site Admin
Posts: 52157
Joined: Thu Aug 05, 2004 6:52 pm
Location: Pakistan

Re: Lahore Airport Expansion Project

Post by Abbas Ali »

Expanded Lahore airport terminal building layout shown on Lahore News channel today apparently shows eighteen passenger boarding bridges.

Image

Image

Image

Image
Car park ground level layout.

Image
Partial view of ground level of car park.

Image
Artist's impression of expanded terminal building interior.

Abbas
Dil Dil Pakistan... Jaan Jaan Pakistan

See you at:
Image
User avatar
Abbas Ali
Site Admin
Posts: 52157
Joined: Thu Aug 05, 2004 6:52 pm
Location: Pakistan

Re: Lahore Airport Expansion Project

Post by Abbas Ali »

In April 7 newspaper:

Request for Proposals

Establishment, operation and maintenance of airport shuttle service at Allama Iqbal International Air Port (AIIAP), Lahore, on round the clock basis


Pakistan Civil Aviation Authority (PCAA) is planning to undertake expansion of terminal building of AIIAP, Lahore, and its allied facilities which shall include inter alia modification of access road network and enlargement of car parking capacity. In order to facilitate smooth movement for passengers, public, and airport employees during construction work, PCAA invites bids/proposals for establishment, operation, and maintenance of airport shuttle service at Allama Iqbal International Air Port (AIIAP), Lahore.

Image

Abbas
Dil Dil Pakistan... Jaan Jaan Pakistan

See you at:
Image
User avatar
Abbas Ali
Site Admin
Posts: 52157
Joined: Thu Aug 05, 2004 6:52 pm
Location: Pakistan

Re: Lahore Airport Expansion Project

Post by Abbas Ali »

In April 8 newspaper:

Tender Notice

For provision of boundary fence around Civil Aviation Authority (CAA) land towards landside at Allama Iqbal International Air Port (AIIAP) - Lahore.

Image

Abbas
Dil Dil Pakistan... Jaan Jaan Pakistan

See you at:
Image
User avatar
Abbas Ali
Site Admin
Posts: 52157
Joined: Thu Aug 05, 2004 6:52 pm
Location: Pakistan

Re: Lahore Airport Expansion Project

Post by Abbas Ali »

Image

Today, Punjab Chief Minister Shehbaz Sharif visited Lahore Airport to review airport's expansion project. He was accompanied by Director General Pakistan Civil Aviation Authority (CAA) Air Marshal (Retd) Asim Suleiman.

During the visit, Mr. Sharif advised officials that minimum/least possible green belt area should be used for airport's expansion project including new access roads. He also reviewed plan to build underground car park for the airport. Importance should be given to beautiful greenery at the airport, he said.

Image

Abbas
Dil Dil Pakistan... Jaan Jaan Pakistan

See you at:
Image
User avatar
Abbas Ali
Site Admin
Posts: 52157
Joined: Thu Aug 05, 2004 6:52 pm
Location: Pakistan

Re: Lahore Airport Expansion Project

Post by Abbas Ali »

Punjab Chief Minister Shehbaz Sharif visited Lahore Airport to review airport's expansion project. According to PTV News, Mr. Sharif asked authorities to enhance airport's beauty with more greenery/plantation with the expansion project. He said that underground car park proposal should be studied and it should be ensured that minimum possible area from existing green belt is used for the project.

Image

Image

Image

Image

Image

Image

Image

Abbas
Dil Dil Pakistan... Jaan Jaan Pakistan

See you at:
Image
User avatar
Abbas Ali
Site Admin
Posts: 52157
Joined: Thu Aug 05, 2004 6:52 pm
Location: Pakistan

Re: Lahore Airport Expansion Project

Post by Abbas Ali »

According to PTV News, a meeting today chaired by Punjab Chief Minister Shehbaz Sharif to discuss proposals for Lahore Airport expansion agreed over design in which construction of airport's new/expanded car park on Parks & Horticulture Authority (PHA) land is proposed. (I think land owned by CAA looked after and beautified by PHA at the airport). The meeting was attended by Director General Pakistan Civil Aviation Authority (CAA) Air Marshal (Retd) Asim Suleiman and others.

Mr. Sharif said that an agreement will be signed with CAA on matters regarding roads infrastructure, greenbelts and horticulture. He said that airport is being expanded keeping in mind future requirements. By using modern technology least possible green area should be used for the project and PHA in shortest possible time should complete the work of shifting trees to different locations from areas to be used for the construction work, he said.

The meeting approved start of construction work for airport's expansion.

Image

Seems the idea of constructing underground car park has been dropped.

Abbas
Dil Dil Pakistan... Jaan Jaan Pakistan

See you at:
Image
Muhammad Rumman
Registered Member
Posts: 9
Joined: Wed Mar 18, 2015 2:29 pm

Re: Lahore Airport Expansion Project

Post by Muhammad Rumman »

Abbas Bhai I think Lahore airport does have an underground parking level but isn't used for security reasons. Were they planning to expand and open it?
User avatar
Abbas Ali
Site Admin
Posts: 52157
Joined: Thu Aug 05, 2004 6:52 pm
Location: Pakistan

Re: Lahore Airport Expansion Project

Post by Abbas Ali »

^ Yes, closed entry/gate of an underground road can be near car park.

Don't know whether it's true or not but I heard that in the original design for people coming from areas like Cantonment, Gulberg, Upper & Lower Mall etc. there was a short route underground access road crossing runways, apron, terminal building before emerging in the car park. The underground road was not opened or completed for general public use for security reasons. The closed entry/exit point for that underground road can be seen in airport's car park.